Data Center

WIN’s “800 Building” data center is a secure and flexible facility located at WIN headquarters in Eau Claire, WI.

The 800 Building data center is staffed around the clock every day of the year by WIN’s Network Management Center (NMC) team, a corps of technical experts that cares for over 100,000 end users across the country.

The data center is engineered to be an agile solution, able to accommodate your needs from a single rack unit to an entire row of dedicated cabinets. With WIN’s data center, your needs drive every step of the process from engineering to deployment and support.

Colocation

Have you already invested in IT but are looking for a new or more secure place to host it? The WIN data center specializes in colocation services, offering the full slate of “rack, stack, and power” that customers expect.

Our data center is move-in ready, with standard rack units standing by for your business equipment. All WIN data center racks enjoy dual and redundant feeds from Xcel Energy specific to each rack, as well as two backup battery systems and backup generators to carry the data center in the event of a power interruption.

If you need something larger than a few RUs, or want a more customized service involving advanced security and monitoring, our engineering team will walk with you through the process of designing and deploying the perfect data center solution.

Whether you’d like to engineer something new from the ground up or simply move your existing infrastructure, you’ll find a protected, hardened, and secure facility at WIN.

SOC 2 Compliant

 

WIN’s data center has passed the rigorous SOC 2 Type 1 and Type 2 examinations for security and availability principles of trust. The SOC examinations were conducted by an independent, third-party CPA firm.

SOC 2 is a set of data center industry standards overseen by the American Institute of CPAs. SOC 2 reports are highly regarded and seen as valuable insight into the day-to-day process and procedures of data center operations. More information on the SOC 2 examination can be found here.

 

Tech Specs

FACILITY
Building Fortified industrial space, former tire plant
Structure 8-11″ steel-reinforced concrete floor and ceiling
Raised Floor 12″
Hardening Zero exterior-facing walls
Ceiling Clearance 8ft

GEOGRAPHY
Floodplain Outside 100 year floodplain
Seismic Zone Seismic Zone 0

SECURITY
Monitoring 24x7x365 onsite Network Management Center
Compliance SOC 2 Type 1 audited and compliant, HIPAA Business Associate trained and tested staff
Video surveillance Interior, officer, perimeter
Access ID required, by escort only

ENVIRONMENT
Aisle Config. Efficent hot/cold aisle design
Fire Suppression VESDA early warning system, 3M NOVEC 1230 non-corrosive fire suppression system
Cooling Efficient in-row chilled air, 5KW per cabinet
Water-free Yes, zero water sources inside data center

POWER
Provider Xcel Energy
Feed 1600 Amps, 480 Volts
Diversity Diverse Xcel substations
UPS Dual, redundant
ATS Yes
Batteries Dual, redundant battery backup
Conditioning Transient Voltage Surge Supression System
Generator 1 500kW (625kVA), turbocharged in-line 6 cylinder, 14.9L
Generator 2 500kW (625kVA), V10 17.5L
Fuel Type Diesel
Failover Testing Weekly
Extended Failover Testing Monthly
Service Biannually, with fuel stability testing

SUPPORT
NMC Onsite 24x7x365 email and phone support
Remote Hands Yes, via onsite NMC
Notifications Yes
Reporting Power, bandwidth statistics available upon request

CONNECTIVITY
Diversity  Yes, diverse 1Gig and 10Gig connections from Tier 1 providers
Bandwidth 10Mbps up to 100Gbps+
Peering Yes, multiple options
Protected Yes, via WIN-owned DWDM transport node
Meet Me Room Yes, onsite
Carrier Neutral Yes
Cross Connects Yes, fiber and copper

BUILDING ACCESS
Loading Dock Protected “back-in” loading space
Elevators Freight (20,000 lbs) and passenger elevators
Package Delivery 24×7 via onsite NMC
Parking 200+ onsite parking spots

CABINETS
RU per cabinet 42 RU
Minimum Space 1 RU
Power Diverse A/B feed to every cabinet
Locking Individual cabinet locks